Please use Chrome, Firefox, or Safari browsers to complete the questionnaire. Edge and Internet Explorer may not send successfully.
Your Name (required)
Your Email (required)
1. What top and bottom level rail pack do you use for your Vista Aluminum Cable Rail system?
2. How does Vista Aluminum Cable Rail Posts speed up installation time?
3. What is the maximum span you can run with cable railing before a post is required?
4. What is the maximum span you can run with cable railing before an intermediate spacer picket is required?
5. How many strands of cable are required in the Vista Aluminum Cable Rail system for 42” level, 36” level, and stair applications?
6. How do you configure your posts for a 90-degree corner with Vista Aluminum Cable Railing System?
7. Is it mandatory to use a new set of fittings at each 90 degree corner post?
8. Can the Vista Cable Railing system be installed on the surface and fascia mount?
9. How does the cable lock into place in the cable fitting?